Keep moisture at bay.
Building basement bathroom raised floor.
The raised drainage platform was a necessity because the main drain the big black one on the right in the first picture did not have a place where we could connect the bathroom drainage to the rest of the house s drainage.
Plumbers labor rates vary a lot by region but a basement bathroom cost would run between 1 200 to 2 000 for a pro job similar to the one shown here.
Provide a flat level surface for the finish flooring.
You ll need help with holding the wood together as you start to secure it and you ll need someone to help lift the wall into place.
You supply the labor and the basement bathroom ideas.
So instead of breaking concrete we built the floor up to accommodate the plumbing.
The plumbing would be underneath the floor.
Building basement bathroom is different from building the one you have in the ground floor.
You ll be working on finishing your basement framing electrical and so on then one day you ll start on your bathroom and you won t come out for like a month and half.
Is this a viable and safe.
Building on the floor.
Not be too high.
If your basement floor is not level which most basement floors aren t building on the.
Essential points to consider for basement bathroom.
There are some crucial points that you need to take into your consideration before building one as basement is located underneath the ground and for this reason it should be treated with extra care.
There was no headroom.
This article will supply the know how.
Unlike above grade sub flooring basement sub floor has to do all of the usual things and more.
Plus i will tell you the 3 things.
The bathroom floor was previously raised about 10 extra inches relative to the rest of the floor for drain pipes that were run above the slab.
Provide a thermal break i e insulation.
Things you ll need nails 3 4 inch osb or plywood sheets 4 x 8 silicone caulk circular saw jig saw subfloor adhesive.
If you re building each section on the floor i highly recommend having someone with you.
A contractor wants to build a raised floor for my bathroom basement that he is building for me instead of breaking the concrete.
Be able to dry out in the event of flooding.
Now i ve cut up the concrete floor had a plumber run pipes re filled with bagged concrete and leveled the cutout with self leveling cement.